OUR PROJECT

Qingyan Weirong Inter-city rail, the first regional intercity high-speed railway in Shandong Province with steel strands and wires supplied by our company, was officially opened to traffic

The main line of Qingdao Yantai Weirong Inter-city rail is 299.18 km long (including 13.3 km of the existing Jiaozhouwan Jinan line), with a total investment of 37.13 billion yuan. It is a passenger dedicated railway, and the number of main lines is double lines. The project was designed at a speed of 250 kilometers per hour, with a reserve of 300 kilometers per hour, and officially began construction in October 2010. On August 25, 2014, the Qingdao Yantai Weirong Inter-city rail was successfully closed in Muping, Yantai, realizing the completion of track laying. On December 28, 2014, the first regional intercity high-speed railway in Shandong Province - Qingdao Yantai Weirong Inter-city rail was officially opened to traffic. Qingyang Weirong Inter-city rail is designed as passenger dedicated railway


Release time: 2018-03-05

Yanyan Expressway

The route of Yan'an Yanchuan Expressway starts from Majiagou in the north of Yan'an and connects with G65 Baotou–Maoming Expressway with a hub overpass, and then goes east through Fengzhuang Township, Qinghuabian Township, Yuanlongsi Township, Yaodian Town, Ganguyi Town, Heijiabao Township of Yanchang County, Yuju Town, Wen'anyi, Yanchuan Town, Majiahe Township, Tugang Township, and Yanshuiguan Town of Yanchuan County. A Yellow River Bridge is set at Liujia to cross the Yellow River to Zhili in Shanxi. The total length of the route is 116.52 kilometers. The entire line adopts the technical standards of a two-way four lane expressway, with a starting point (Majiagou) to Yaodian section of 37.1 kilometers and a section from Yanchuan to Shaanxi Shanxi boundary of 33.4 kilometers, with a design speed of 80


Release time: 2018-03-05

Xikang Second Line

The full name of Xi'an-Ankang Second Line is the second line project of Xi'an Ankang Additional Railway. The line starts from Yaocun Station of Longhai railway in the north, passes through South Xi'an, Zhashui, Zhen'an, Xunyang County, and ends in Hanbin District in the south. The total length of the line project is 243.8 kilometers. The main stations include Yaocun, Xi'an South, Zhashui, Zhen'an, and Xunyang North to Ankang Station. The total investment of the project is 11.16 billion yuan. The additional second line of Xi'an–Ankang railway is designed to be 160 km/h. Constructed by China Railway Electrification Bureau, China Railway 12th Bureau, China Railway 19th Bureau, and China Railway 20th Bureau. At 15:30 on October 30, 2013, after six hours of intense fighting by thousands of railway construction workers, the first cargo was transported


Release time: 2018-03-05

< 12 >